Abstract:The standard verification method of CBS of WMO is introduced.The products of T63 model are verified with the method,and are compared with the model products of T42 and that of the Japan model as well.The results show that the useful forecast effectiveness can reach 5-6 days.The prediction error range is much less than that of the T42 model.